Member News: Successful Trials of Apollo’s PALM Charger Pave the Way for Commercial Marine EV Charging Solutions

October 28, 2024
Member News: Successful Trials of Apollo’s PALM Charger Pave the Way for Commercial Marine EV Charging Solutions

Apollo, a leading engineering and energy advisory consultancy, is proud to announce the successful completion of trials for its innovative PALM Charger system. Supported by nearly £800,000 in funding from the UK Department for Transport (DfT) through Innovate UK, these trials mark a significant step forward in developing offshore charging solutions for marine electric vessels.

The trials, conducted in collaboration with Orkney-based partners Leask Marine and the European Marine Energy Centre (EMEC), were carried out in Orkney waters in October 2024 at EMEC’s Scapa Flow test site. The PALM Charger, a pioneering ‘plug and play’ charging point, is designed to enable electric service vessels (SOVs) and other marine EVs to recharge while operating offshore for extended periods.

Successful Demonstration in Offshore Conditions

These trials aimed to demonstrate the technology in a real offshore environment, explore the electrical aspects of power transfer, and refine the marine design. The trials were a resounding success, with the PALM Charger successfully completing multiple connect, power, and disconnect operations under a variety of sea conditions.

The results showcased 100% reliability of the mechanical and electrical connection and provided key insights into the marine handling operations. These findings will inform the next stage of development and support final design refinements.

Nigel Robinson, Offshore Renewables Director at Apollo, commented, “The excellent teamwork across all partners—Apollo, Leask Marine, and EMEC—was key to the successful execution of this ambitious project. The trials have demonstrated that our technology is ready for the next commercialisation stage. The reliability and performance we’ve seen in Orkney waters, along with the lessons learned, position us well to deliver a commercial product that will revolutionise marine EV charging.”

Douglas Leask, Managing Director of Leask Marine Ltd, said, “Leask Marine is always proud to be part of innovative projects like Apollo’s PALM Trials, as we firmly believe that groundbreaking technology is crucial for the evolution of the marine industry. This project holds the potential to drive significant change in energy transition, enabling working vessels to operate in a more environmentally sustainable manner. We were especially pleased to collaborate as a partner with Apollo and EMEC on this project, contributing to a greener future for the maritime sector.”

Abbie Sinclair, Assistant Project Manager, at EMEC, said: “We’ve really enjoyed working with Apollo and Leask Marine on this project. We supported Apollo in proving the electrical connectivity of the PALM connector by leading the testing operations, providing power supply and designing a bespoke electrical and control system to facilitate the tests. We worked closely with Leask Marine to set up their barge as a test rig to mimic vessel handling operations.

“EMEC specialise in facilitating at sea trials of marine technologies. The PALM charger trials took place at our test site in Scapa Flow, a leased area of seabed created for testing marine energy technologies and subsystems. This trial provides a great example of the flexibility of our test sites and how we can support other industries, in this case maritime decarbonisation, to demonstrate concepts and ideas in a real-life scenario.”

Next Steps: Commercial Deployment in 2025/26

Building on the success of these trials, Apollo is moving towards a commercial redesign of the PALM Charger, with deployment planned for 2025/26. With a European Patent Pending, the PALM Charger is poised to play a key role in enabling low-emission electric vessels across offshore wind, fishing, and aquaculture, supporting broader decarbonisation efforts in the marine sector.

Apollo welcomes discussions with organisations interested in exploring the potential of the PALM Charger for their marine operations. To learn more, contact us at [email protected].

Get in touch

AREG is the original energy transition organisation, working on behalf of members to empower the energy supply chain and champion its expertise. Please get in touch if you have any questions or would like to find out more about membership.

AREG has played an important role in the growth of Scotland’s renewable energy sector, engaging the supply chain and developing the European Offshore Wind Deployment Centre. However, we are only at the very beginning of the transition that AREG was established to both lead and support so there are still opportunities for companies to get into the constantly evolving renewables supply chain. We look forward to continuing our work together as renewables builds on its place as Scotland’s main source of power, and as we seek to deliver real change in the crucial areas of heat and transport.

Scottish Renewables

Aberdeen & Grampian Chamber of Commerce has worked closely with AREG since its formation. The recent progress in the developments of offshore wind projects by Equinor and Vattenfall are as a result of the work of the group over many years. The north-east is known as the oil and gas capital of Europe. At the Chamber, we believe the region must evolve its position to being recognised as the energy capital. Whilst hydrocarbons will continue to be essential in driving our economy for years to come, the generation of renewable resources will play an increasingly important role in providing cost-effective power, innovative development and economic growth.

Aberdeen & Grampian Chamber of Commerce

The enthusiasm and dedication of the early group that would become AREG was fundamental in us choosing to launch All-Energy in Aberdeen. The first tiny show was held in 2001, and AREG’s Chairman at the time, Jeremy Cresswell, played such an active role that I often describe him in terms such as All-Energy’s ‘midwife’. All-Energy is now the UK’s largest renewable and low carbon energy exhibition and conference in terms of number of attendees, space booked, and number of exhibiting companies. As AREG became firmly established, their presence and support for the event grew spectacularly over the years. We thank them most sincerely for their invaluable input.

All-Energy

Vattenfall has forged a strong working relationship with AREG through the development of the European Offshore Wind Deployment Centre. AREG has worked tirelessly on behalf of the North East and it can take enormous credit for the growth of sustainable energy in the region and the path it has cleared for the region to capture further investment.

Vattenfall

Aberdeen City and Shire is emerging as a key location for renewables by successfully transferring its world-class oil and gas expertise into the sector and AREG has done much to advance this through a broad range of initiatives. It has acted as a catalyst in driving further investment in the local economy by engaging with companies, Government, public bodies and existing projects and we have been pleased to support their efforts. Scottish Enterprise will continue to engage with AREG as we increase Scotland’s use of renewable energy.

Scottish Enterprise